This position is a once in a lifetime opportunity for someone starting out in the golf course industry.
The second assistant superintendent works under guidance of the director of agronomy and superintendent. The second assistant is a hands-on and management position. The main purpose of this position is to support the director of agronomy in the grow-in aspect of the golf course renovation. Responsibilities include; seeding of playing surfaces; applying pre-plant fertilizers; watering all new seed and sodded areas; maturing all newly grassed areas; creating grow-in irrigation programs; applying turf health products; assisting with agronomic practices; delegating work assignments; overseeing job performance; inspecting course conditions; supervises the proper use of all equipment; conducts small construction projects; manages weekend operations when needed, and does related work as required. After construction is complete this position will assist in all the work needed to mature the golf course to world-class standards. These duties will consist of over seeding and sodding along with small construction activities. Finally, this position will assist in the superintendent with the daily operation of the newly renovated property. He or she shall conduct the aforementioned responsibilities in a manner that complies with the world-class standards of The Club at Spruce Peak. The second assistant superintendent may serve in the superintendent and/or other assistant capacity during his/her absence.
Stowe Country Club is an 18-hole private golf club originally designed by William Mitchell that opened in 1969. The golf course is set in the iconic village of Stowe, VT with views of the Worcester mountain range, Mount Mansfield, and Camel’s Hump. The golf course is undergoing a major renovation. All greens, tees, bunkers, fairways, and irrigation are being renovated. Stowe Country Club has partnered with Beau Welling Design as the architect, Paul Granger as the irrigation consultant, and NMP Golf Construction as the general contractor. We will open the newly renovated front nine and close the back nine for renovation in the spring of 2025. The grand opening of the full 18-holes will be in the spring of 2026. A new 13,000 square foot turf care center was built in 2024 to support the newly renovated golf course.