1. Operation Urethane machine #1 and #2
- Check the air compressor for Urethane Units 1 and 2.
- Constant temperature for Coating mantle and check product check
- Operation of the cooling unit on the panel
- Check the temperature of the raw material
- Check the temperature of the dispenser
- Ensure that the heating furnace of the band heater of the raw material is properly maintained
- Check the condition of the drum's raw material being transferred to the tank well and check the vacuum condition.
- Urethane machine setting – check the overall groove of the Assembly engine and check the temperature of the Cure oven
- Full groove fixing of cooling – check cooling temperature
- Secure and verify the entire groove of the demold section
- Full groove fixing and verification of unloading section
- Check the temperature of the preheater
- After cleaning the nozzle of the robot's dispensing, attach the mixer.
- Check the urethane molding ball eccentricity
2. Mold cleaning work – 2 times/ 1year day cleaning work
- Mold replacement
- Mold disintegration
- Sanding
- application of release agent
- Mold assembly
3. Ball inspection
4. Ball extraction
TaylorMade Golf Company is an equal opportunity employer. All qualified applicants receive consideration for employment without regard to race, religious creed, color, national origin or ancestry, physical or mental disability, medical condition, genetic information, marital status, sex, pregnancy, gender, gender identity, gender expression, age, sexual orientation, military and veteran status or any other basis protected by federal, state or local law, ordinance, or regulation.